
The fourth part of the Yangshan Port will initially be capable to deal with 4 million TEUs after it enters full operation, which is able to assist consolidate Shanghai port”s place because the world’s main port.
Up to now, the tools that has been put into trial operation contains 10 bridge cranes, 40 rail-mounted gantry cranes and 50 AGVs. The challenge will ultimately be outfitted with 26 bridge cranes, 120 rail-mounted gantry cranes and 130 AGVs.